Jiangsu G Home CO.,LTD

Prefabricated Modular Home Expert 

Sincerity Innovation Perfection Benefit

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsModern Modular Buildings

Pre - Fabrication Modern Modular Buildings Environmental With PPVC Method

GHOME's solution only takes just three days to construct a floor, compared to 14 to 21 days using conventional construction methods.That is great!!

—— John Smith

The faster completion allowed us to increase capacity and introduce a new model of care at an earlier stage, and benefit from operational efficiencies

—— Kevin Oxley

The construction process, management of the site, and the liaison with the main contractor, all worked very well.

—— Alan Thomas

I'm Online Chat Now

Pre - Fabrication Modern Modular Buildings Environmental With PPVC Method

China Pre - Fabrication Modern Modular Buildings Environmental With PPVC Method supplier

Large Image :  Pre - Fabrication Modern Modular Buildings Environmental With PPVC Method

Product Details:

Place of Origin: Yangzhou,Jiangsu,China
Model Number: Custom-made

Payment & Shipping Terms:

Minimum Order Quantity: 200 ㎡
Price: Negotiable
Packaging Details: Normal Package
Delivery Time: 1 month
Supply Ability: 3000 ㎡ per month
Detailed Product Description
Material: Steel Structure And Sandwich Panel Ceiling: Gypsum Board
Door: Steel Door Window: Aluminum Alloy
Floor: PVC Or Wooden Other Fittings: Showerroom, Toilet, Kitchen, Carridor

Pre - Fabrication Modern Modular Buildings Environmental With PPVC Method

 

 

Description

 

Pre-fabrication has 3 core benefits over "traditional construction": SPEED, QUALITY and PRICE. Choosing the right delivery team early maximizes all 3 of these leading to the optimum success for your high rise construction project:

 

 

Speed

 

Timing is critical, upon 100% design freeze, almost the entire structure is fabricated to be completed all at the same time. Timing this with the critical path for on site works can cut construction programmer time up to 50%.

 

 

Quality

 

Each module, room, finish is scrutinized in factory environment. Quality inspection test procedures are adopted from mass manufacturing techniques which results in 100's of inspections, checks, monitors and compliance tests are completed PER MODULE. Result = 100% quality assurance.

 

 

Price

 

Because most of the modular house will be built in the factory,it saves a lot of labor cost on site.The installation time is much shorter than the traditonal building,the commercial building can be open ASAP,which is much helpful to the cash flow.

 

Pre - Fabrication Modern Modular Buildings Environmental With PPVC Method

Contact Details
Jiangsu G Home CO.,LTD

Contact Person: Miss. Mandy Ho

Send your inquiry directly to us (0 / 3000)